Muse Architects

Architect: Muse Architects
Project Type: Residential
Client: N/A
Terms: N/A
Strategy: N/A
Date: N/A

Design in Details

Nelrose sits at the corner of Princess Road and Nell Lane, Manchester M20 2LT, a gateway site on a key route into the city with strong public transport access. Muse Architects’ pre application concept sets out a commercial led mixed use strategy; revitalise an ageing building; strengthen the street edge; and support local business alongside new homes.

The scheme is grounded in context. Midrise blocks already front Princess Road; providing precedent for a proposal of up to six storeys, with stepping toward quieter streets. At ground level, two flexible commercial units address both frontages; unit one is circa 166 sq m and unit two is circa 108 sq m. Both units are arranged level with the pavement and use proportioned glazing to animate the junction; residential access is separated to keep the commercial frontage clear and legible.

Above, 25 apartments are planned to align with Manchester residential quality guidance and the Nationally Described Space Standard; 20 two-bedroom homes at circa 70 sq m and 5 one-bedroom homes at circa 50 sq m. Layouts prioritise daylight, efficient circulation, lift access, and durable specification.

Movement is designed in. Secure cycle storage for 32 bikes provides 128 percent provision; car parking is limited to 15 spaces, including one accessible bay; supporting reduced car dependency.

The proposed development centres on a coordinated package of internal re planning and targeted extensions. At ground and lower ground, the scheme introduces an improved entrance sequence, new lift and stair cores, and a covered courtyard to enhance wayfinding, safety and inclusivity. The ground floor extends into the courtyard to enlarge the main prayer hall and provide supporting community uses including youth space, kitchen provision and accessible WCs. Existing educational areas are strengthened through additional classrooms and multi-functional rooms, enabling structured learning programmes and community support activities.

  •  Strategic Planning:
    We believe every successful project starts with thoughtful planning. Our team carefully analyzes space, functionality, and client needs to create efficient layouts that balance practicality with visual appeal.
  • Creative Design Solutions: Our designs combine creativity with purpose. Whether residential or commercial, we craft unique architectural concepts that reflect personality, enhance usability, and bring innovative ideas to life
  • Modern & Stylish Architecture: We focus on contemporary aesthetics, clean lines, and elegant materials to create modern, stylish spaces that feel fresh, sophisticated, and timeless.
  • Functional & Inspiring Spaces: From homes to commercial environments, we design spaces that inspire comfort, productivity, and connection; ensuring beauty, functionality, and long-term value in every project.
Please add the statistics for this project!

Incredible Result

Materiality combines craft and clarity; a brick grid with recessed windows and sculpted reveals; multi tone brickwork complemented by grey GRC and bronze anodised aluminium reveals. Environmental ambition is embedded; the scheme targets a BREEAM Outstanding outcome, subject to assessment and design development.

A planning ready pathway is defined; coordinated drawings and supporting narrative; transport and drainage; and the technical evidence set, including ground conditions, ecology, noise, daylight and sunlight, and fire strategy inputs. Concept summary only; subject to surveys, client instruction, viability testing, technical confirmation, and statutory approvals; no third-party reliance.

Nelrose is positioned as a commercial led gateway regeneration for Manchester; flexible ground floor units to support local enterprise; 25 well planned homes above; and a durable façade concept that balances context with a clear identity. The proposal demonstrates Muse Architects’ planning led approach to mixed use design; a defined massing strategy; efficient apartment layouts; an active street edge; a cycle first movement plan; and an integrated sustainability brief; subject to surveys and technical verification. The next stage is to complete the technical evidence pack and move from pre application dialogue to a validation ready submission; with programme, viability, and statutory approvals managed as key dependencies.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare